Expandable container house 20ft fully deserves the fame as one of the most popular products in the market. To make it own unique appearance, our designers are required to be good at observing the design sources and getting inspired. They come up with the far-reaching and creative ideas to design the product. By adopting the progressive technologies, our technicians make our product highly sophisticated and function perfectly.
CCP Prefab has become a brand that is widely purchased by global customers. Many customers have remarked that our products are absolutely perfect in the quality, performance, usability, etc. and have reported that our products are the best-seller among the products they have. Our products have successfully helped many startups find their own footing in their market. Our products are highly competitive in the industry.
Customization for Expandable container house 20ft and fast delivery are available at CCP Prefab House. Besides, the company is dedicated to providing timely product delivery.
Product: Container house
Manufacturer: CCP
Purpose of Use: Construction site worker camps
Quantity: 2500 rooms
Time: 2023-2024
Location: Saudi Arabia
The Saudi Red Sea City construction site container worker camps project is a large-scale initiative designed to provide high-quality, modular living and working spaces for workers in Saudi Arabia. The project involves the construction and installation of 2,500 modular container units, which will serve as dormitories, offices, dining halls, and recreational areas. These units are intended to create a comfortable and functional environment for workers, ensuring their well-being and productivity. The project is characterized by its efficient timeline, with a production cycle of 30 days and an installation cycle of 45 days. To ensure smooth execution, our company sent a professional installation team to collaborate with the local installation team, combining expertise and local knowledge to deliver the project on time and to the highest standards.
The 2,500 modular container units are designed to meet the diverse needs of workers. The dormitories will provide comfortable living spaces, while the offices will facilitate administrative and operational activities. The dining halls will offer a space for meals and social interaction, and the recreational areas will include facilities for relaxation and leisure, promoting a balanced lifestyle for the workers. Each unit is engineered for durability, ease of assembly, and adaptability to the local climate and environmental conditions.
Production Phase (30 Days):
Our company finished all the container rooms in 30days. The process begins with the procurement of high-quality raw materials, followed by the assembly of the units. Advanced manufacturing techniques will ensure precision and efficiency, while rigorous quality control measures will guarantee that each unit meets the required standards. By the end of the 30-day production period, all 2,500 modular container units were inspected, packaged, and prepared for transportation to the project site.
Installation Phase (45 Days):
Our company’s installation team worked closely with the local team to ensure efficient and accurate assembly. The collaborative effort focused on aligning the units according to the project layout, connecting utilities, and setting up the functional areas.
One of the key strengths of this project is the collaboration between our company’s installation team and the local team. Our team brings technical expertise, experience in modular construction, and a commitment to quality, while the local team provides valuable insights into the region’s conditions, regulations, and cultural considerations. This partnership ensures that the project is executed seamlessly, with minimal disruptions and maximum efficiency.
Throughout the project, quality and safety will remain top priorities. During production, each unit will undergo stringent quality checks to ensure it meets design specifications and durability standards. During installation, safety protocols will be strictly enforced to protect workers and ensure a hazard-free environment. Regular inspections and audits will be conducted to maintain the highest levels of quality and safety.
This container worker campls project is a testament to modern modular construction techniques and efficient project management. It provided workers with a comfortable and functional living and working environment. The collaboration between our company’s installation team and the local team ensures that the project is executed smoothly, meeting both timelines and quality standards. This project not only addresses the immediate needs of workers but also sets a benchmark for future modular construction projects in the region.
This housing project is organized by the Timor Leste government and handling by the local contractor. It is to provide houses to those homeless people in their country. There are two types of these houses which are two-bedroom and three-bedroom type. This project is divided in several phases for building and the total quantity is 6000units house.
All the houses are using prefabricated system and the major materials are galvanized steel structure and sandwich panels. These prefabricated houses are with good fireproof and waterproof performance. The houses are designed to suit the local climate of Timor.
2022 Qatar World Cup FIFA Fan's container hotel project, with a total of around 10,000 star-rated standard hotel suite rooms, provides a convenient and comfortable living environment for the fans from all over the world to support their favorite teams. They called these container hotel blocks the "FIFA fan's village". And this "village" is also including reception, catering, public restroom and service areas which are all built by container houses. Meanwhile, different areas are consisting of different colors of container house, which are very distinctive.
Because of the modular building system, the contractor only took two months to build all the rooms. CCP provided 3500 rooms as one of the major suppliers of this project.
After the 2023 earthquake in Turkey, the Turkish government and the international community moved quickly to set up victims’ camps to provide temporary shelter. Most of these camps are built by container house which can be put into use quickly to provide emergency shelter for people affected by disasters.
The container house adopts the frame steel structure, which has good seismic performance and can reduce the risk of secondary damage. And compared with regular tents, container houses provide higher security and comfort. They are usually equipped with separate toilets and kitchens, and with water and electricity, living conditions are almost same as the conventional homes.
The Turkish government plans to build a large number of container houses to accommodate the victims. At the first stage, there are 1.4 million people already living in tents and 34,000 people living in containers. And the government plans to expand the number of container houses to meet the needs of more victims.
Several countries and organizations have provided container house assistance, such as Qatar to provide about 10,000 container houses to Turkey and Syria. Those container houses were used for temporary accommodation during the World Cup, which are made in China, with complete living facilities. And Chinese enterprises are also involved in the production and supply of container houses.
The Turkish government has pledged to rebuild homes for the victims and has begun rebuilding new homes in the affected towns, while continuing to provide container houses as temporary shelters until permanent housing is built.